solved Option #1: Gantt Chart Using the scenario posed in the

Option #1: Gantt Chart

Using the scenario posed in the discussion board for this week (also linked below), draft a high-level project schedule (Gantt Chart) using a computer application of your choice (i.e., Excel or MS Project) that includes the project checkpoints needed to ensure project success. Make sure that you assign resources to tasks, create dependencies, and workgroup packages (subtasks that give detail). Note: The project timeline is six months.
Scenario:
Deen, A., Balkaran, R. (2013). An analysis of hotels and its similarities to the management of hospitals: A case study of a Provincial Hospital in South Africa (Links to an external site.). Journal of Economics and Behavioral Studies, 5(9): 573-579.
Submit your Gantt chart in a single Word document. To accomplish this, you will need to paste or import your Gantt chart into a Word document. (Hand-drawn charts and those submitted as a file embedded as an object will not be accepted.) For tips on how to do this, review the following resources:

https://www.officetimeline.com/gantt-chart-excel (Links to an external site.)
https://support.office.com/en-us/article/Insert-a-chart-from-an-Excel-spreadsheet-into-Word-0b4d40a5-3544-4dcd-b28f-ba82a9b9f1e1 (Links to an external site.)
http://www.mamu.co/blog/insert-microsoft-project-gantt-chart-into-microsoft-word.html (Links to an external site.).

Be sure to properly organize your writing and include an introduction, headings / subheadings for the body of your work, an analysis and recommendations (if applicable), a conclusion, and a list of references. Consult the assignment template for a more complete list of requirements. Assignment template: http://csuglobal.libguides.com/ld.php?content_id=21534702 (Links to an external site.).

Looking for an Assignment Help? Order a custom-written, plagiarism-free paper

Order Now